Skip to main content

FURST400 DC Fast Charger


High-power charging for high-value commercial sites.

The FURST400 is a commercial DC fast-charging solution built for properties that need to serve more drivers, reduce charging time, and create a stronger EV charging experience.


With up to 400 kW of available DC charging power and dual-output capability, the FURST400 is designed for public charging, supermarkets, retail centers, hospitality properties, fleets, travel-oriented destinations, municipalities, and other commercial sites where speed, reliability, and driver convenience matter.


Furst Charge helps you evaluate whether the FURST400 is the right fit for your site before you invest. We assess electrical capacity, utility requirements, parking layout, anticipated utilization, project cost, operating strategy, and long-term growth potential.


[Request FURST400 Pricing]
[Request a Site Feasibility Review]


Final charging performance depends on the vehicle, battery state of charge, battery temperature, vehicle charging capability, charger configuration, utility capacity, and site operating conditions.


Why choose the FURST400?


Deliver faster charging where it matters

The FURST400 is designed for locations where drivers need to charge during a shorter visit rather than park for several hours.


It may be a strong fit for:

  • Supermarkets and grocery stores
  • Retail centers and shopping destinations
  • Restaurants and hospitality properties
  • Medical and service destinations
  • Travel-oriented and public-access locations
  • Fleet depots and commercial vehicle operations
  • Municipal and community charging locations
  • Properties with driver dwell times of approximately 20 to 30 minutes or longer


Higher available charging power can help compatible EVs add meaningful range during a shopping trip, meal, appointment, work stop, or fleet charging window.


Serve more than one vehicle

The FURST400 is designed as a dual-output DC fast-charging platform, allowing a site to serve multiple EV drivers from one charging system.


That can help property owners:

  • Improve driver access during busier charging periods
  • Increase the number of charging sessions the site can support
  • Use parking space more efficiently
  • Create a better experience for customers, guests, tenants, employees, and fleet operators
  • Build charging capacity without immediately installing separate high-power cabinets for every stall


Actual simultaneous charging performance depends on the selected configuration and how available power is allocated between vehicles.


Build for today and plan for growth

A charging project should support the demand you have today while providing a practical path for future expansion.


The FURST400 can be evaluated as part of a broader site plan that considers:

  • Current electrical capacity
  • Utility service and transformer requirements
  • Future charger expansion
  • Site traffic and charging demand
  • Parking layout and vehicle circulation
  • Power sharing and energy-management strategy
  • Battery energy storage, where appropriate
  • Long-term operating costs and demand-charge exposure


Furst Charge helps property owners avoid both underbuilding and overbuilding by matching the charging system to the property’s real-world use case and financial objectives.


Strengthen the customer experience

For customer-facing properties, EV charging can become part of the overall visitor experience.

The FURST400 may help a property attract and serve EV drivers while they shop, dine, visit, work, receive services, or travel through the area. A reliable, easy-to-find fast-charging location can help differentiate a property in a competitive market.


Potential property benefits may include:

  • Increased customer convenience
  • Longer customer dwell time
  • Additional charging-session revenue
  • A modern amenity for tenants, guests, and employees
  • Better use of underutilized parking areas
  • Increased visibility in charging-location apps and maps
  • A future-ready property strategy


Results vary by location, pricing, utilization, electricity costs, demand charges, local competition, and other project-specific factors.


Built for commercial applications


Retail and supermarkets

Supermarkets and retail centers can be strong candidates for DC fast charging when drivers have public access, a convenient site layout, visibility, adequate parking, meaningful dwell time, and a feasible electrical path.


The FURST400 can help create a faster charging experience for drivers who want to charge while shopping or visiting nearby businesses.


Hospitality and destination properties

Hotels, restaurants, entertainment venues, medical offices, and service destinations can use high-power charging to add convenience for guests and visitors who need to charge during a scheduled stop.


Public-access charging

Publicly accessible locations near travel corridors, commercial districts, convenience destinations, and active community areas may benefit from high-power fast charging when the location has sufficient demand, electrical feasibility, and a sound operating plan.


Fleet charging

Fleets may use high-power charging to support operational schedules, turnaround time, vehicle utilization, and depot charging needs. Furst Charge evaluates fleet routes, vehicle types, charging windows, available power, operating costs, and future fleet growth before recommending a configuration.


FURST400 site requirements

High-power charging requires careful site planning. Before recommending the FURST400, Furst Charge evaluates:

  • Available electrical service and existing site load
  • Transformer capacity and utility-upgrade requirements
  • Switchgear, panels, electrical distribution, and protection equipment
  • Charger placement, parking layout, cable reach, and traffic flow
  • Trenching, conduit, concrete, bollards, signage, and site work
  • Utility interconnection, construction schedule, and permitting
  • Charging demand, pricing strategy, utilization, and operating economics
  • Demand charges, time-of-use rates, and energy-management options
  • Network connectivity, payment options, access control, and driver experience
  • Future expansion and long-term service requirements


A property may still be a candidate for the FURST400 even when existing capacity is limited. Depending on the site, Furst Charge may evaluate utility upgrades, power sharing, load management, managed charging, battery energy storage, or a phased deployment approach.


What Furst Charge provides

Furst Charge supports more than equipment procurement. Our team can help with:

  • Commercial site feasibility review
  • Electrical and utility assessment
  • Charger configuration and deployment planning
  • Project budget and preliminary pro forma
  • Utility coordination and infrastructure planning
  • Funding and incentive opportunity review
  • Equipment sourcing and logistics
  • Installation coordination
  • Commissioning and network activation
  • Pricing and driver-access setup
  • Remote monitoring and operational support
  • Maintenance and long-term growth planning


Is the FURST400 right for your property?

The FURST400 may be a strong option for properties that need high-power charging, have a public-access or fleet use case, and can support the electrical and financial requirements of a commercial fast-charging project.


The first step is a feasibility review. Furst Charge will help you understand your property’s electrical capacity, construction needs, utility path, expected operating costs, charger options, potential funding opportunities, and long-term project economics.


[Request FURST400 Pricing]
[Request a Site Feasibility Review]


Call or text: 1-855-GO-FURST
Email: info@furstcharge.com


Important product note

FURST400 availability, configuration, power output, simultaneous charging capability, connector options, network features, warranty terms, installation requirements, and lead times depend on the final equipment configuration and applicable project conditions. Charging speed and energy delivery vary by vehicle, battery conditions, charger configuration, utility supply, site load, and operating conditions. Project costs, incentives, revenue, utilization, and financial performance are not guaranteed.[ppl-ai-file-upload.s3.amazonaws]